Close Menu
AI News TodayAI News Today

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Flesh-eating screwworms feast on humans in Mexico; human cases top 500

    Europe’s free satellite service just made it easier to track wildfires

    After Rippling blew millions on AI in months, it built an employee ROI tool

    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    Facebook X (Twitter) Instagram Pinterest Vimeo
    AI News TodayAI News Today
    • Home
    • AI News
    • AI Reviews
    • AI Tools
    • AI Tutorials
    • Chatbots
    • Free AI Tools
    • Artificial Intelligence
    AI News TodayAI News Today
    Home»AI News»Texas halts data center connections to power grid amid overwhelming demand
    AI News

    Texas halts data center connections to power grid amid overwhelming demand

    By No Comments2 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
    People hold signs opposing data centers during ap protest at the Capitol in Austin on July 27, 2026.
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Abbott’s directive also seeks to increase scrutiny of measures that data centers are taking to “reduce impacts on neighboring property owners and communities, including noise mitigation, light controls, setbacks, traffic improvements, emergency response coordination and other community protection measures.”

    But the directive conspicuously neglects to mention local air pollution and greenhouse gas emissions associated with data centers. Nonprofit newsroom Floodlight has reported that AI companies used a local permit loophole in Texas to install gas-powered turbines and backup diesel generators on site at new data center campuses—all without requiring more extensive environmental reviews or outreach to local communities.

    Notably, the Texas pause on data center grid connections does not apply to data center projects that are building their own on-site power generation to get up and running as fast as possible. That “behind-the-meter power” strategy has become increasingly common among tech and AI companies like Meta, Microsoft, Amazon, Oracle, OpenAI, and Anthropic, according to research by market intelligence platform CleanView.

    Such behind-the-meter power typically relies on natural gas. But with lengthy order backlogs for combined-cycle gas turbines, CleanView says data center developers are turning to alternative sources, such as “mobile gas generators strapped to semitrucks” and “aeroderivative turbines originally designed for aircraft and warships.”

    Texas leads all US states in total announced behind-the-meter capacity for data centers by having 40 gigawatts of such announced capacity. That factor is driven by the Texas Permian Basin gas supply and “extensive pipeline infrastructure” along with the “state’s permissive regulatory environment,” according to CleanView.

    The national resistance to data centers

    Despite the oversight gaps, the Texas moratorium on data center approvals “throws a massive wrench into ERCOT’s plans to bring data centers online,” according to E&E News. The Texas grid operator has been seeking to connect data center projects to the grid in groups, with notifications for the coveted first group known as “Batch Zero” planned to go out by the end of this week. But ERCOT officials said they will postpone the Batch Zero process while working with state regulators to carry out Abbott’s directive.

    Center Connections Data Demand grid halts overwhelming power Texas
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleSpaceX doubles revenue on Anthropic and Google compute deals, Starlink growth
    Next Article AMD’s datacenter business is booming while gaming takes a backseat
    • Website

    Related Posts

    AI News

    After Rippling blew millions on AI in months, it built an employee ROI tool

    AI News

    Judge rules Meta caused “public nuisance” and must fund mental health treatment

    Chatbots

    SpaceX’s Terafab will rely on natural gas power plants, not Tesla solar panels

    Add A Comment
    Leave A Reply Cancel Reply

    Top Posts

    Flesh-eating screwworms feast on humans in Mexico; human cases top 500

    0 Views

    Europe’s free satellite service just made it easier to track wildfires

    0 Views

    After Rippling blew millions on AI in months, it built an employee ROI tool

    0 Views
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    AI Tutorials

    Quantization from the ground up

    AI Tools

    David Sacks is done as AI czar — here’s what he’s doing instead

    AI Reviews

    Judge sides with Anthropic to temporarily block the Pentagon’s ban

    Subscribe to Updates

    Get the latest tech news from FooBar about tech, design and biz.

    Most Popular

    Flesh-eating screwworms feast on humans in Mexico; human cases top 500

    0 Views

    Europe’s free satellite service just made it easier to track wildfires

    0 Views

    After Rippling blew millions on AI in months, it built an employee ROI tool

    0 Views
    Our Picks

    Quantization from the ground up

    David Sacks is done as AI czar — here’s what he’s doing instead

    Judge sides with Anthropic to temporarily block the Pentagon’s ban

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Facebook X (Twitter) Instagram Pinterest
    • About Us
    • Contact Us
    • Terms & Conditions
    • Privacy Policy
    • Disclaimer

    © 2026 ainewstoday.co. All rights reserved. Designed by DD.

    Type above and press Enter to search. Press Esc to cancel.