Close Menu
AI News TodayAI News Today

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Flesh-eating screwworms feast on humans in Mexico; human cases top 500

    Europe’s free satellite service just made it easier to track wildfires

    After Rippling blew millions on AI in months, it built an employee ROI tool

    Facebook X (Twitter) Instagram
    • About Us
    • Contact Us
    Facebook X (Twitter) Instagram Pinterest Vimeo
    AI News TodayAI News Today
    • Home
    • AI News
    • AI Reviews
    • AI Tools
    • AI Tutorials
    • Chatbots
    • Free AI Tools
    • Artificial Intelligence
    AI News TodayAI News Today
    Home»AI Reviews»Texas halts new data centers as governor calls for audits
    AI Reviews

    Texas halts new data centers as governor calls for audits

    By No Comments3 Mins Read
    Share Facebook Twitter Pinterest LinkedIn Tumblr Reddit Telegram Email
    Greg Abbott, governor of Texas, as US President Donald Trump, not pictured, speaks before an executive order signing in the East Room of the White House in Washington, DC, US, on Thursday, March 20, 2025. The order directs the secretary of education to take steps to close the department and "return education authority to the States," according to a White House fact sheet on the order. Photographer: Bonnie Cash/UPI/Bloomberg via Getty Images
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Tech companies and developers have been scouring the U.S. for places to build data centers, and they’ve been drawn to Texas’ loose regulations and seemingly abundant power supply. Only Virginia hosts more data centers than Texas.

    But even Texas can be pushed to the brink. Governor Greg Abbott announced Monday that all new data center projects will need to be audited by both the Public Utility Commission of Texas (PUCT) and the state’s grid operator, the Electric Reliability Council of Texas (ERCOT).

    The size of ERCOT’s interconnection queue has grown dramatically this year. In January, ERCOT had 233 gigawatts of projects waiting to connect to its grid. In less than six months, that figure had more than doubled. Today, Abbott’s office said ERCOT is tracking 474 gigawatts of new connection requests. About 90% of those are data centers, according to the grid operator.

    Some of those projects are simply paper proposals at this point. Because queues for grid connections have grown so long, the first action many developers take is to get in line. Many projects fizzle out as they progress.

    If even a fraction of those proposed projects come to fruition, they could overwhelm the Texas grid. The interconnection queue today represents more than five times ERCOT’s total peak demand. 

    While many data center operators, including Google and Microsoft, have been drawn to Texas for its ample natural gas reserves, wind and solar have helped ERCOT keep pace with growing electricity demand, according to the Energy Information Administration (EIA). Utility-scale solar capacity grew fourfold between 2021 and 2025. Meanwhile, electricity prices declined over much of that time, according to a report from Amperon.

    Electricity prices in Texas are relatively affordable compared with other states, but they have been rising. Data centers and crypto-mining facilities have pushed prices higher, according to the EIA.

    Abbott clearly wants to head off that trend. The governor has directed PUCT and ERCOT to collect a range of information about proposed data centers, including their on- and off-site demand for electricity and water, noise-mitigation efforts, light controls, use of tax incentives, and ownership details.

    Historically, Texas has favored lighter regulation than many other states when it comes to development. Houston famously lacks a zoning code, and the state has a business-friendly regulatory environment. But data centers have become a flash point across the country, including in Texas. Abbott had previously tried to coax data centers into providing more information through a voluntary survey. Most didn’t respond, so he’s taking a heavier hand to compel compliance. 

    Depending on what emerges from the audits, Texas’ days as a data center mecca may be coming to a close.

    When you purchase through links in our articles, we may earn a small commission. This doesn’t affect our editorial independence.

    Audits calls Centers Data governor halts Texas
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Previous ArticleSpotify expands AI remix and covers project with Merlin partnership
    Next Article Walmart completes its acquisition of TV advertising company Vibe.co
    • Website

    Related Posts

    AI Reviews

    Europe’s free satellite service just made it easier to track wildfires

    AI Reviews

    What to Include in a Heart Health Daily Regimen, From Supplements to Home Monitors

    AI Reviews

    Fenix Flexin isn’t even denying using AI to make ‘Rubberz’ anymore

    Add A Comment
    Leave A Reply Cancel Reply

    Top Posts

    Flesh-eating screwworms feast on humans in Mexico; human cases top 500

    0 Views

    Europe’s free satellite service just made it easier to track wildfires

    0 Views

    After Rippling blew millions on AI in months, it built an employee ROI tool

    0 Views
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    AI Tutorials

    Quantization from the ground up

    AI Tools

    David Sacks is done as AI czar — here’s what he’s doing instead

    AI Reviews

    Judge sides with Anthropic to temporarily block the Pentagon’s ban

    Subscribe to Updates

    Get the latest tech news from FooBar about tech, design and biz.

    Most Popular

    Flesh-eating screwworms feast on humans in Mexico; human cases top 500

    0 Views

    Europe’s free satellite service just made it easier to track wildfires

    0 Views

    After Rippling blew millions on AI in months, it built an employee ROI tool

    0 Views
    Our Picks

    Quantization from the ground up

    David Sacks is done as AI czar — here’s what he’s doing instead

    Judge sides with Anthropic to temporarily block the Pentagon’s ban

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    Facebook X (Twitter) Instagram Pinterest
    • About Us
    • Contact Us
    • Terms & Conditions
    • Privacy Policy
    • Disclaimer

    © 2026 ainewstoday.co. All rights reserved. Designed by DD.

    Type above and press Enter to search. Press Esc to cancel.